New Brunswick High School is a high school in Medina County, Brunswick, Ohio. The school is set to undergo construction to replace the current 340,000 square foot building with a new 285,000 square foot building. The project is estimated to cost $109,000,000 and is expected to begin construction in January 2025. The new high school will include athletic stadiums and a performing arts community.
Characteristics | Values |
---|---|
Location | Brunswick, OH |
Construction | A new high school is being constructed to replace the current 340,000 square foot building. |
Cost | $109,000,000 |
Voter Referendum | The project was not approved in the November 2022 voter referendum but will be voted on again in May. |
Timeline | Construction is expected to start in January 2025. |
What You'll Learn
New Brunswick High School is in need of replacement
The need for a new building was highlighted by a recent incident where the school was closed for seven days due to a water main break. This incident brought to light the necessity of taking action sooner rather than later, as the current building is not reflective of modern learning environments and is facing issues related to overcrowding and physical challenges.
Community members have expressed their desire for improved safety measures, such as fixing open staircases, and for the inclusion of new facilities like science labs, media labs, and athletic facilities. The cost of renovating or rebuilding the school is estimated to be around $480 million, and residents are concerned about the potential impact on their tax bills.
However, many residents believe that investing in education and the future generation is crucial, and that the benefits of a new building, such as improved collaboration across departments and enhanced learning experiences, outweigh the costs. They argue that a new building will make the area more appealing to the next generation and increase the value of homes in the township.
Millionaires in New Brunswick: How Many?
You may want to see also
The school district is pushing for a new high school
The Brunswick City School District is pushing for a new high school after their previous attempt failed in the November 2022 election. Superintendent Jason Niedermeyer has stated that the high school has failing systems, including a faulty HVAC system and a leaking roof. The problems have only worsened since the last election, and the district is once again asking voters to decide on the future of students' education. The new plan will cost taxpayers $7.14 per $100,000 of home value.
The school district has a $42.6 million coupon from the state of Ohio that they are hoping to utilize for the construction of a new high school building. The plan also includes adding classrooms and improving traffic patterns at Applewood and Kidder Elementary schools, as well as building a performing arts center, a maintenance facility, and a Board of Education office. The total cost of the project is estimated at $102 million, with the remaining funds coming from a 37-year, $102 million bond issue approved by Brunswick voters.
The current conditions at the high school are less than ideal, with garbage cans collecting rainwater and liquid from the failing HVAC system. Superintendent Niedermeyer understands that inflation is a concern for families but emphasizes that the cost of the project will only increase if they don't receive support now. The school district is hopeful that the community will recognize the need for a new high school and approve the necessary funds.
The new high school will provide a better learning environment for students and address the current issues with the school's infrastructure. It will also allow for additional classrooms and improved traffic patterns at the elementary schools. The performing arts center and other facilities included in the plan will benefit the entire community. The school district is urging voters to consider the future of the city and the impact a new high school could have on the education and opportunities of its students.
Growing Celery in New Brunswick
You may want to see also
The new high school will cost over $100 million to build
New Brunswick High School in New Jersey cost $185 million to build. The school, which opened its doors to 1,300 students, boasts a range of impressive features and amenities that justify its high price tag.
Firstly, the school is expansive, covering 400,000 square feet. This allows for spacious classrooms and common areas, promoting a comfortable learning environment for students. The large campus also accommodates state-of-the-art athletic fields, providing ample space for extracurricular activities and sports programs.
In addition to its size, the school incorporates modern technology and sustainable features. It is equipped with rooftop solar panels, harnessing renewable energy and reducing the school's environmental footprint. The school also features Smart Boards in classrooms, replacing traditional blackboards with interactive and engaging learning tools.
The construction of the new high school also addressed issues with the previous facility. The previous Brunswick High School was a sprawling 340,000 sq. foot facility that had exceeded its lifespan. It was a combination of three separate structures, constructed over two decades and connected by a single roof. The age and complexity of the infrastructure made maintenance costly and challenging. Issues with the HVAC system and leaking roofs impacted the learning environment and student experience.
The new high school, approved in May 2023, was built to address these issues and provide a modern, efficient, and comfortable learning space for students. The total cost of $102 million was funded through a 37-year, $102 million bond issue for Brunswick City Schools facilities improvements. This included not only the construction of the new high school but also improvements to elementary schools, the construction of a performing arts center, and funding for a Board of Education office.
Brunswick, Georgia: A Sprawling Coastal City
You may want to see also
The current high school building is over 340,000 square feet
New Brunswick High School (NBHS) is a public high school in New Brunswick, New Jersey, serving students from grades 9 to 12. The current high school building, located on Route 27, opened in January 2010 and is over 340,000 square feet or 37,000 square metres. The previous high school building, located on Livingston Avenue, was completed in 1964 and was 166,000 square feet. The current building is significantly larger and was constructed at a cost of $185 million. The new, larger facility was needed due to overcrowding in the previous building, which had led to the use of modular classrooms.
The current high school building boasts a range of facilities, including 67 classrooms, dedicated spaces for music and industrial arts, a gymnasium, a cafeteria, an auditorium, a library, and office space. The school was originally built to accommodate 1,200 students, but the current enrolment is 2,477 students, highlighting the need for a larger space. The student-teacher ratio is 14.0:1, with 177.1 classroom teachers.
The high school offers a wide range of extracurricular activities, including over 40 clubs and nearly 20 student organisations. There are clubs dedicated to languages and cultures, academic fields, sports, music, art, computers, and other interests. Student organisations include the National Honor Society, the Key Club, and the International Thespian Society. The school also has a student council, a school newspaper, and groups dedicated to designing the yearbook and literary magazine.
The school's athletic facilities are also impressive, with a gymnasium, a football stadium (Memorial Stadium), baseball diamonds, and a running track. The school's sports teams, known as the Zebras, compete in various interscholastic athletic programs, including football, baseball, basketball, softball, soccer, and wrestling, among others.
Brunswick, GA: Florida's Neighbor
You may want to see also
The new high school will be ready by January 2025
The new high school in Brunswick, Ohio, will be ready by January 2025. The construction of the new school building is a much-needed development, as the current Brunswick High School, built in the early 1960s, has been in a state of disrepair for years. The school's failing HVAC system and leaky roof have caused rainwater and liquid from the HVAC system to collect in garbage cans in the hallways.
In November 2022, voters in Brunswick and Brunswick Hills rejected a bond issue that would have funded the construction of a new high school. However, in May 2023, voters approved a $102 million bond issue for Brunswick City Schools facilities improvements, including the construction of a new high school. The new school will be approximately 285,000 square feet, replacing the current 340,000 square foot building.
The new high school will feature improved infrastructure and modern amenities. It will have a performing arts center, athletic stadiums, and classrooms equipped with state-of-the-art technology. The construction process will prioritize energy efficiency and sustainability, incorporating innovative design elements and materials that meet the latest industry standards.
The project is expected to cost an estimated $109,000,000 and will be funded through a combination of state funds and local taxpayer contributions. The state of Ohio has offered $46.2 million in funding, and the remaining costs will be covered by the local community. The new high school is expected to serve as a hub for intellectual, athletic, and cultural activities, benefiting students and the entire community.
Edibles: Legal Status in New Brunswick
You may want to see also